Modernizing Electrical Pipeline Pump System for an Energy Producer
Challenge A mid-sized oil and gas producer faced operational challenges with their existing electric pipeline pump system. The system’s components were reaching the end of life..
Midstream Pipeline Automation and Instrumentation Control System
Challenge A regional refinery needed access to greater volumes and more diverse grades of crude oil. The original client assets were not capable of moving the desired product from..
Custom Ignition SCADA Deployment for Leading Independent Energy Company
Challenge A leading Independent Energy Company had an antiquated SCADA system that was unable to meet the growth and potential of its operations and accounting needs. With..
CygNet and Microsoft Azure Integration using TIGA Cloud Connector
Problem: An energy company has an extensive asset base comprised of conventional and unconventional natural gas, natural gas liquids, and oil producing wells across the..
Using IIoT for Improved Operational Outcomes
High Level Summary of Project WaterBridge Operating, a midstream water management company was not receiving the level of reliability and support that they needed with their..
Simplifying Control Centers for Improved Operational Management
Challenge Sunoco Logistics’ DNA Telvent system was a custom SCADA platform engineered specifically for the existing asset system and took more than 8 years to complete. The tag..
Ignition SCADA Improvements for Pharmaceutical Manufacturer
Challenge A leading pharmaceutical manufacturer was experiencing emergency data loss from their Nano Variable Particle (NVP) devices across 55 rooms at their Dallas, Texas campus...
Cost savings through remote enablement and scalable services
Project Overview CNX Resources, a premiere independent oil, shale gas exploration and production company with operations centered in the Appalachian Basin, enlisted TIGA as a..
The University Of Oklahoma Process Control System Development and AVEVA SCADA Integration
Problem The University of Oklahoma (OU) Norman Campus is a large campus made up of over 300 buildings distributed across a sprawling 3,326 acres. Using equipment from various..