---
title: Resources
description: TIGA provides creative solutions that increase reliability, safety, operational efficiency, and data-driven decisions by leveraging our innovative technologies.
---

[Skip to content](https://www.tiga.us/resources#main-content)

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

[![](https://www.tiga.us/hubfs/AdobeStock_600979909%20%281%29.jpeg) ](https://www.tiga.us/resources/pi-data-integration)

## [Integrating AVEVA PI with Enterprise Systems](https://www.tiga.us/resources/pi-data-integration)

[Use case](https://www.tiga.us/resources/tag/use-case)

Evolution of the Use of AVEVA PI Traditionally, assets and metadata within AVEVA PI and AVEVA PI Asset Framework (AF) were primarily accessed by users through the platform or..

[Read the Case Study](https://www.tiga.us/resources/pi-data-integration)

[![](https://www.tiga.us/hubfs/Untitled-1-1.jpg) ](https://www.tiga.us/resources/modernizing-electrical-pipeline-pump-system)

## [Modernizing Electrical Pipeline Pump System for an Energy Producer](https://www.tiga.us/resources/modernizing-electrical-pipeline-pump-system)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Challenge A mid-sized oil and gas producer faced operational challenges with their existing electric pipeline pump system. The system’s components were reaching the end of life..

[Read the Case Study](https://www.tiga.us/resources/modernizing-electrical-pipeline-pump-system)

[![](https://www.tiga.us/hubfs/social-crop.jpg) ](https://www.tiga.us/resources/midstream-pipeline-automation-and-instrumentation-control-system)

## [Midstream Pipeline Automation and Instrumentation Control System](https://www.tiga.us/resources/midstream-pipeline-automation-and-instrumentation-control-system)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Challenge A regional refinery needed access to greater volumes and more diverse grades of crude oil. The original client assets were not capable of moving the desired product from..

[Read the Case Study](https://www.tiga.us/resources/midstream-pipeline-automation-and-instrumentation-control-system)

[![](https://www.tiga.us/hubfs/Headerimage-1.png) ](https://www.tiga.us/resources/custom-ignition-scada-deployment)

## [Custom Ignition SCADA Deployment for Leading Independent Energy Company](https://www.tiga.us/resources/custom-ignition-scada-deployment)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Challenge A leading Independent Energy Company had an antiquated SCADA system that was unable to meet the growth and potential of its operations and accounting needs. With..

[Read the Case Study](https://www.tiga.us/resources/custom-ignition-scada-deployment)

[![](https://www.tiga.us/hubfs/Energy.jpg) ](https://www.tiga.us/resources/cygnet-and-microsoft-azure-integration-using-tiga-cloud-connector)

## [CygNet and Microsoft Azure Integration using TIGA Cloud Connector](https://www.tiga.us/resources/cygnet-and-microsoft-azure-integration-using-tiga-cloud-connector)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Problem: An energy company has an extensive asset base comprised of conventional and unconventional natural gas, natural gas liquids, and oil producing wells across the..

[Read the Case Study](https://www.tiga.us/resources/cygnet-and-microsoft-azure-integration-using-tiga-cloud-connector)

[![](https://www.tiga.us/hubfs/Screen%20Shot%202021-03-10%20at%205.50.17%20PM.png) ](https://www.tiga.us/resources/using-iiot-for-improved-operational-outcomes)

## [Using IIoT for Improved Operational Outcomes](https://www.tiga.us/resources/using-iiot-for-improved-operational-outcomes)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

High Level Summary of Project WaterBridge Operating, a midstream water management company was not receiving the level of reliability and support that they needed with their..

[Read the Case Study](https://www.tiga.us/resources/using-iiot-for-improved-operational-outcomes)

[![](https://www.tiga.us/hubfs/Screen%20Shot%202021-03-16%20at%202-13-45%20PM-1.png) ](https://www.tiga.us/resources/simplifying-control-centers-for-improved-operational-management)

## [Simplifying Control Centers for Improved Operational Management](https://www.tiga.us/resources/simplifying-control-centers-for-improved-operational-management)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Challenge Sunoco Logistics’ DNA Telvent system was a custom SCADA platform engineered specifically for the existing asset system and took more than 8 years to complete. The tag..

[Read the Case Study](https://www.tiga.us/resources/simplifying-control-centers-for-improved-operational-management)

[![](https://www.tiga.us/hubfs/Pharma%20BAckground-2.jpg) ](https://www.tiga.us/resources/ignition-scada-improvements-for-pharmaceutical-manufacturer)

## [Ignition SCADA Improvements for Pharmaceutical Manufacturer](https://www.tiga.us/resources/ignition-scada-improvements-for-pharmaceutical-manufacturer)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Challenge A leading pharmaceutical manufacturer was experiencing emergency data loss from their Nano Variable Particle (NVP) devices across 55 rooms at their Dallas, Texas campus...

[Read the Case Study](https://www.tiga.us/resources/ignition-scada-improvements-for-pharmaceutical-manufacturer)

[![](https://www.tiga.us/hubfs/CNX-Case-Study_Featured.png) ](https://www.tiga.us/resources/cost-savings-through-remote-enablement-and-scalable-services)

## [Cost savings through remote enablement and scalable services](https://www.tiga.us/resources/cost-savings-through-remote-enablement-and-scalable-services)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Project Overview CNX Resources, a premiere independent oil, shale gas exploration and production company with operations centered in the Appalachian Basin, enlisted TIGA as a..

[Read the Case Study](https://www.tiga.us/resources/cost-savings-through-remote-enablement-and-scalable-services)

[![](https://www.tiga.us/hubfs/OU.jpg) ](https://www.tiga.us/resources/the-university-of-oklahoma-process-control-system-development-and-aveva-scada-integration)

## [The University Of Oklahoma Process Control System Development and AVEVA SCADA Integration](https://www.tiga.us/resources/the-university-of-oklahoma-process-control-system-development-and-aveva-scada-integration)

[Casestudy](https://www.tiga.us/resources/tag/casestudy)

Problem The University of Oklahoma (OU) Norman Campus is a large campus made up of over 300 buildings distributed across a sprawling 3,326 acres. Using equipment from various..

[Read the Case Study](https://www.tiga.us/resources/the-university-of-oklahoma-process-control-system-development-and-aveva-scada-integration)